New Carbonmurph Con...
 
Notifications
Clear all

New Carbonmurph Construction

64 Posts
10 Users
25 Likes
6,192 Views
TJ McFlys
(@tj-mcflys)
Mike Reis Press Box Poster
Joined: 2 years ago
Posts: 415
 

Posted by: @mr_woogers

Posted by: @tj-mcflys

Assuming all concrete has been poured at the SIMMS site? Has anyone noticed this driving by that location? Steel structure should be starting very soon I would imagine.  

Foundation and footings are all poured - bunch of pipes sticking up, etc.

Looks to be a good sized building.

 

Thank you for the update. Assuming pipes are rough in for plumbing, and conduit for electrical. Rendering's online present it to be quite large/impressive.  

 


   
ReplyQuote
TJ McFlys
(@tj-mcflys)
Mike Reis Press Box Poster
Joined: 2 years ago
Posts: 415
 

Hearing from some folks who live local to Carbondale, that the steel framework has begun to take shape at the new SIMMS center. Looking forward to seeing in person when I venture over for a few Saturday games.


   
ReplyQuote
Mr_Woogers
(@mr_woogers)
Saluki Platnum Member
Joined: 6 years ago
Posts: 5608
Topic starter  

Bunch of I beams sticking up from the concrete - something's going on there. LOL

https://explorecarbondale.com/419/Southern-Illinois-Multimodal-Station-SIM


   
ReplyQuote
Mr_Woogers
(@mr_woogers)
Saluki Platnum Member
Joined: 6 years ago
Posts: 5608
Topic starter  

Roof is about on the train station - big building. Big enough for Thomas and Gordon!


   
AirDawg86 reacted
ReplyQuote
Page 5 / 5

Share: